Idea Option 1: It would be more efficient to enable the scheduling of individual slides within a slideshow rather than having to manage separately in displays.
Idea Option 2: Have slideshow content and displays integrated in a way that would allow for the scheduling of specific slides within a full slideshow to override the one fixed scheduled period for the entire slideshow.
Use Case Senario: During National Days or Holidays, communities often desire to display a single slide corresponding to the specific date of the occasion. However, in LifeLoop displays, achieving this requires creating separate designer slideshow projects solely for these individual slides and then incorporating them as new content into the displays. This process is both cumbersome and time-consuming.
Either way, the idea options this would eliminate the need for multiple designer slideshow projects and simplifying the scheduling process altogether.